Septic System Services • Miami-Dade & Broward

A Reliable Septic System Starts With the Right Plan

Septic-system installation, replacement, repairs and sewer conversions for residential and commercial properties. We help coordinate the planning, permitting, construction and inspections your project needs.
Residential & Commercial · Property-Specific Solutions
Your project, from start to finish

Plan. Build. Close Out.

Site and permit review
Engineering and system layout
Installation and replacement
Inspection coordination
Final grading and project closeout
Service availability depends on your property, site conditions and permitting jurisdiction.
Know When to Take the Next Step

Septic Problems Need a Property-Specific Assessment

A sewage backup, recurring drainage problem or failed inspection can be a sign that your septic system needs attention. An evaluation helps determine whether a repair, tank replacement or new drainfield is appropriate.

Common Warning Signs

  • Sewage backing up into the building
  • Slow drains throughout the property
  • Standing water or sewage odors near the system
  • Unusually green or wet areas over the drainfield
  • A damaged or leaking tank
  • A failed inspection or agency notice
Septic Construction & Engineering

The Right Scope for Your Site and Your System

From new installations to sewer conversions, we review your property and proposed work before determining the required design, permits and construction scope.

New Septic Systems

Tank and drainfield installation, from site evaluation and system layout through construction and required inspections.

Tank & Drainfield Replacement

Evaluation of failed drainfields and damaged tanks. Tank-only replacement may be possible when the rest of the system remains functional and compliant.

Repairs & Modifications

Project-specific assessment to determine whether a repair or modification is feasible under site conditions and permitting requirements.

Abandonment & Sewer Conversion

Septic abandonment and sewer connections where public sewer is available, including plans, coordination, installation and closeout as required.

A Clear Process From Review to Closeout

01

Review Your Property

Share your address, system concerns, plans and any inspection or agency notices. A site visit may be needed.
02

Plan & Coordinate

We help define the scope and coordinate system design, applications and required approvals.
03

Build & Close Out

Complete the approved work, coordinate inspections, and address final grading and project closeout.
Construction is our primary focus. Routine septic pumping and cleaning are not our main services. Pumping required for construction must be performed by an appropriately authorized septic-service provider.
Septic System FAQs

Questions Before Starting?

Explore common questions about installation, replacement, permitting, costs and sewer connections.

Yes. We provide septic-system installation, replacement, modification, and abandonment services for residential and commercial properties throughout Miami-Dade and Broward County. Service availability depends on the property location, site conditions, and permitting jurisdiction.

Depending on the project, our services may include:

  • Site and permit review
  • Coordination of soil testing and site evaluation
  • Septic-system layout and design
  • Permit application assistance
  • Excavation and site preparation
  • Septic tank and drainfield installation
  • Required inspections
  • Final grading and project closeout

We review the property before construction to determine the specific services required.

Yes. New septic systems and most septic-system replacements or major modifications require a permit. Additional building, plumbing, environmental, zoning, or municipal approvals may also be required.

We can review your property and help coordinate the required plans, applications, inspections, and approvals.

Common warning signs include:

  • Sewage backing up into the building
  • Slow drains throughout the property
  • Standing water near the septic tank or drainfield
  • Unpleasant sewage odors
  • unusually green or wet areas over the drainfield
  • A failed septic inspection
  • A damaged, leaking, or deteriorated septic tank
  • A notice from a government agency

A site evaluation is usually necessary to determine whether repair is feasible or full replacement is required.

Yes. We can evaluate and replace failed drainfields when permitted by the site conditions and applicable regulations. The replacement design may depend on the available property area, soil conditions, groundwater level, building use, and required setbacks.

In some cases, yes. If the drainfield remains functional and compliant, replacing only the damaged or deteriorated tank may be possible. The permitting authority may require an evaluation of the entire system before approving a tank-only replacement.

Yes. We work on both residential and commercial septic projects. Commercial systems are generally designed according to the building’s use, estimated wastewater flow, occupancy, plumbing fixtures, and site conditions.

Yes. We provide septic-abandonment and sewer-connection services where public sewer is available. The work may include:

  • Sewer availability research
  • Engineering and plumbing plans
  • Permit coordination
  • Sewer lateral installation
  • Septic-tank pumping and abandonment
  • Plumbing conversion
  • Inspections and final closeout

Possibly. Connection requirements depend on the property location, the applicable utility, local regulations, and whether an official sewer-availability or connection notice has been issued.

We can review the property and help determine whether a connection is currently required.

The cost depends on several factors, including:

  • Tank and drainfield size
  • Residential or commercial use
  • Soil and groundwater conditions
  • Type of treatment system required
  • Accessibility for excavation equipment
  • Existing structures and utilities
  • Required engineering and permitting
  • Restoration after construction

We provide project-specific estimates after reviewing the property and proposed scope of work.

Actual construction may take several days, but the complete project also includes design, permitting, utility coordination, inspections, and closeout. The overall schedule depends heavily on the permitting jurisdiction, system complexity, and site conditions.

Our primary focus is septic-system construction, including new installations, replacements, repairs, abandonment, and sewer conversions. If pumping is required as part of a construction project, it must be completed by an appropriately authorized septic-service provider.

Start With Your Property

Tell Us What Your Septic Project Needs

Send your property address and a brief description of the work. We will review your request and help determine the next step. A site visit may be needed before a final construction proposal.
Have a survey, existing plans or an agency notice? Mention it in your message so our team can request the relevant documents.
Serving Miami-Dade and Broward County.

Request a Project Estimate

By submitting, you agree to be contacted about your service request.
Scroll al inicio